Local Law 31 — the one-time XRF inspection program.
Local Law 31 of 2020 required every pre-1960 NYC dwelling unit to receive a one-time XRF lead inspection by August 9, 2025. Owners who missed the deadline face open HPD violations, accruing penalties, and an inspection backlog. Envirex performs LL31 inspections at scale, including the post-deadline catch-up work.
What Local Law 31 requires.
Local Law 31 of 2020 amended NYC's Childhood Lead Poisoning Prevention Act to require that every dwelling unit in a multiple dwelling erected before 1960 receive a one-time XRF lead-based paint inspection. The original deadline was August 9, 2025, with HPD-issued extensions in limited circumstances. The inspection must:
- Be performed by an EPA-certified lead-based paint inspector or risk assessor;
- Use an XRF instrument operated to the relevant ASTM and HUD standards;
- Cover every painted component in the dwelling unit and the building's common areas serving that unit;
- Generate a written inspection report that the owner must retain for the life of the building's compliance record.
The report becomes the baseline lead-paint inventory for the unit, feeding into the annual Local Law 1 investigation cycle and into turnover compliance.
What Envirex does for LL31 inspections.
Scope of work for an LL31 engagement:
- Building inventory. A walk of the building to confirm the unit count, common-area scope, and any units already inspected under prior owners or programs.
- Calibrated XRF survey. Every painted component in every in-scope unit and common area is read individually with a NIST-traceable, calibrated XRF instrument. Daily calibration logs are appended to the report.
- Inconclusive resolution. Any inconclusive reading triggers paint-chip sampling for AIHA-LAP confirmation. See Paint Chip Sampling.
- Friction and impact surface flagging. Window stools, troughs, sashes, doors and other friction surfaces with lead are flagged for inclusion in the building's annual maintenance and turnover protocols.
- Sealed inspection report. Signed and sealed by the EPA-certified inspector, with photographs, sample maps and calibration data. Delivered to the owner in 24–48 hours.
- Compliance file. The LL31 report is filed into the building's compliance record alongside the annual LL1 investigation log.
If you missed the August 9, 2025 deadline.
HPD has been working through inspection backlogs since the deadline. Owners with uninspected pre-1960 units face one of three scenarios:
- Active HPD violation. A Class B or Class C lead violation has been issued citing the missing LL31 inspection. The clock is running on civil penalties. Envirex's HPD Lead Violation Closure workflow handles these end-to-end.
- Pre-violation, owner-initiated catch-up. No violation has been issued yet but the owner needs to complete the inspection before HPD notices. We schedule rapid LL31 surveys for owners in this position.
- Portfolio-wide gap. Larger owners with multiple unrelated pre-1960 buildings often need a coordinated multi-building catch-up. We scope these as portfolio engagements with consolidated reporting.
Common LL31 questions.
The LL31 inspection sits inside a larger compliance ecosystem — RRP, turnover, abatement clearance, HUD Section 35. We brief owners on how the LL31 record interacts with each so the same inspection isn't paid for twice in adjacent programs.
Local Law 31 — common questions.
Does LL31 apply to owner-occupied 1-2 family homes?
How long does an LL31 inspection take per unit?
If we already have an XRF report from before LL31, does it satisfy the requirement?
What's the penalty for failing to complete an LL31 inspection?
Will the LL31 inspector identify lead in common areas too?
Related landing pages.
Local Law 1
Annual lead investigation cycle for pre-1960 housing with children.
View details NYC HPDHPD Lead Violation Closure
Class C lead violations including missed LL31 inspections.
View details ServiceXRF Inspections
The testing modality required for LL31 compliance.
View details ArticleLL31 Deadline Aftermath
What we're seeing in HPD activity since the August 2025 cutoff.
Read articleReady to schedule an inspection or quote a project?
Tell us about your property and what you need. We'll return a clear, written quote — no obligation, no pressure.